Ballygrainey Nurseries
CLIENT
McMillan Construction
CLIENT
£ 1
Project Value
Our client made an initial enquiry regarding the supply and commissioning of a domestic water irrigation system for a new build property in Holywood Co. Down. An initial on-site consultation was carried out with all relevant parties such as the architect, primary contractor and the client.
The DPS Product sales team selected an irrigation system to not only suit the garden design requirements but also the on-site water storage limitations.
After careful consideration, DPS decided that an underground water storage tank was the best fit due to the limited space and the clients concerns that a above ground tank was detrimental the aesthetic look of the property.
Hunter PGP sprinklers heads were selected to be used in conjunction with an X controller panel which would provide the homeowner with maximum control and flexibility. Pumping the water from the tank our engineers decided to go with a DAB Euroinox 30/80 M. At the rear of the property, shrubs and hedging was to be fed by a node battery controller which was to be linked to 16mm dripline tubing. The node controller was ideal as the client wanted a controller which would switch on when the conditions were dry and not start when conditions were wet.
Having installed and commissioned the equipment on-site to the design specifications, DPS completed the handover to the client once satisfactory testing of the system was completed.
DPS offer unrivalled customer support and strive to ensure a successful closure of each project.
This enables the final signoff and close-out of projects to be performed within the agreed time scale and with ultimate client satisfaction.
Having installed and commissioned the equipment on-site to the design specifications, DPS completed the handover to the client once satisfactory testing of the system was completed.
DPS offer unrivalled customer support and strive to ensure a successful closure of each project.
This enables the final signoff and close-out of projects to be performed within the agreed time scale and with ultimate client satisfaction.
Throughout the initial consultation, design phase and commissioning, DPS kept in close contact with the on-site manager and client so that the DPS service department could plan when they were required on-site. This helped all parties maximise their time and productivity.
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |