Blower Replacement Project

Project Title

Municipal

Client

Veolia Water

CASE STUDY

Blower Replacement Project

Veolia Blower Replacement Project

About Veolia Water

Veolia Water Outsourcing Limited operates Ballynacor WwTW under a PPP contract with Northern Ireland Water. Veolia Water required DPS to replace their two blowers at their Ballynacor and Armagh sites. Through general use and over time the two pieces of equipment were not operating to their maximum productivity and needed replaced.

Veolia Water Technologies in the UK, is one of the leaders and a long-established solutions provider of water treatment solutions and services. Veolia provide a comprehensive range of water re-use and recovery solutions, process water & wastewater treatment, drinking water technologies and services to help maintain your systems across municipal, industrial, scientific and healthcare markets.

DPS & Delta

- A Powerful Combination -

As distributors of pumping and treatment products to the water, wastewater, agriculture and industrial sectors, DPS has been a supply partner to many companies for over thirty years.

Our supply agreements with global-best-in-class manufacturers allow us to offer premium level pumping, blended with mixing excellence and cutting-edge macerators with full factory backup.

Our pricing structure allows us to offer a full supply, installation and service solution for complete project delivery at no commercial disadvantage to you, our customer, for total confidence and seamless support.

DPS & Delta

- A Powerful Combination -

As distributors of pumping and treatment products to the water, wastewater, agriculture and industrial sectors, DPS has been a supply partner to many companies for over thirty years.

Our supply agreements with global-best-in-class manufacturers allow us to offer premium level pumping, blended with mixing excellence and cutting-edge macerators with full factory backup.

Our pricing structure allows us to offer a full supply, installation and service solution for complete project delivery at no commercial disadvantage to you, our customer, for total confidence and seamless support.

Industry Expertise

Project Scope

  • Craneage

  • New Pipe work and sundries

  • New Blower Cables Connected

  • New stainless-steel pipework measured and returned to workshop

  • Stainless-steel pipework welded in workshop and returned to site for installation

  • Complete pre-start up checks

Design

Industry leading knowledge to help aid with the deisgn processes through a highly qualified and industry award winning team

Relationships

  • Supplier relationships of industry products

  • Bringing contractors together to make the project run smoothly

  • Industry relationships through years of experience and commercial success

MCC

  • Factory testing provided by R&R

  • After installation on site and power connected, the MCC will be tested again

Training Plan

DPS will provide sufficient training to personnel to enable them to correctly and safely operate and after installation on site and power connected, the MCC will be tested

Download our PDFs here:

Sewage Treatment Plant
Case Study