Pump Skid Project

About our Pump Skid Project

The client for this particular job required DPS to provide a chilled water booster set. The client required DPS to improve the pressure of their cold-water supply and to also provide them with the insurance that the efficiency of their new water supply is never comprised.

DPS & KSB

- A Powerful Combination -

As distributors of pumping and treatment products to the water, wastewater, agriculture and industrial sectors, DPS has been a supply partner to many companies for over thirty years.

Our supply agreements with global-best-in-class manufacturers allow us to offer premium level pumping, blended with mixing excellence and cutting-edge macerators with full factory backup.

Our pricing structure allows us to offer a full supply, installation and service solution for complete project delivery at no commercial disadvantage to you, our customer, for total confidence and seamless support.

DPS & KSB

- A Powerful Combination -

As distributors of pumping and treatment products to the water, wastewater, agriculture and industrial sectors, DPS has been a supply partner to many companies for over thirty years.

Our supply agreements with global-best-in-class manufacturers allow us to offer premium level pumping, blended with mixing excellence and cutting-edge macerators with full factory backup.

Our pricing structure allows us to offer a full supply, installation and service solution for complete project delivery at no commercial disadvantage to you, our customer, for total confidence and seamless support.

Industry Expertise

Project Scope

  • Two new transport pumps were connected via a separation header. The existing main transport pumps had a maximum head of 370 kPa so the new pumps were made to deliver at least this pressure.

  • The transport pumps were installed in a 10ft container on a 100mm high steel frame. The container provided for this customer included a control panel for each transport pump and the container contained all piping, control equipment, ventilation and electric heating. The walls, doors and roof of the container were insulated with 50mm sandwich panels.

  • The ventilation consisted of 2 air grills 250x250 mm in the container doors and roof exhaust fan to help control the temperature.

Design

Industry leading knowledge to help aid with the deisgn processes through a highly qualified and industry award winning team

Relationships

  • Supplier relationships of industry products

  • Bringing contractors together to make the project run smoothly

  • Industry relationships through years of experience and commercial success

MCC

  • Factory testing provided by R&R

  • After installation on site and power connected, the MCC will be tested again

Training Plan

DPS will provide sufficient training to personnel to enable them to correctly and safely operate and after installation on site and power connected, the MCC will be tested