Dublin Airport

About Dublin Airport

Over the past few years Dublin Airport has been working to improve and introduce sustainable initiatives across its campus which will deliver a range of benefits to those that work at Dublin Airport and to the surrounding local communities. Targets have been set around key areas such as carbon, energy, waste, water and air quality.


Through this shift in sustainable initiatives Dublin Airport required DPS to repair, upgrade and make minor alternations to the existing bunds to ensure that their integrity and conformance to environmental legislation and best practice. This project also required DPS to remove and replace existing PA tanks and associated pumps to optimise the space and existing infrastructure, to ensure optimisation of the airfield’s assets and robustness during its winter operation.

DPS & Crest Pumps

- A Powerful Combination -

As distributors of pumping and treatment products to the water, wastewater, agriculture and industrial sectors, DPS has been a supply partner to many companies for over thirty years.

Our supply agreements with global-best-in-class manufacturers allow us to offer premium level pumping, blended with mixing excellence and cutting-edge macerators with full factory backup.

Our pricing structure allows us to offer a full supply, installation and service solution for complete project delivery at no commercial disadvantage to you, our customer, for total confidence and seamless support.

DPS & Crest Pumps

- A Powerful Combination -

As distributors of pumping and treatment products to the water, wastewater, agriculture and industrial sectors, DPS has been a supply partner to many companies for over thirty years.

Our supply agreements with global-best-in-class manufacturers allow us to offer premium level pumping, blended with mixing excellence and cutting-edge macerators with full factory backup.

Our pricing structure allows us to offer a full supply, installation and service solution for complete project delivery at no commercial disadvantage to you, our customer, for total confidence and seamless support.

Industry Expertise

Project Scope

South Apron PA Tanks

  • The Removal and disposal of the damaged 35,000l tank from an existing bund and decommissioning of pump and pumping system.

  • Two 15m2 interconnect Tuffa tanks to be decommissioned, moved and recommissioned fully with a DPS specialist engineer sign off to Airfield maintenance bund. Tank and volume measurement system to be fully recommissioned to reflect new location.

Airfield Maintenance Base (Bunds 1&2)

  • The combination of the two existing bunds 1 & 2 (40m3 and 29m3 respectively) into one bund and carry out all repair works.

  • Modify all pipe work to ensure fill point is within bund and housed appropriately, ensure all cabling and pipe work is raised off the floor to an adequate height

  • The installation of simplified pump dispensing system at fill points with simple on and off operator button for filling and emptying.

Bund 3 & Associated Tanks

  • The Decommissioning, removal and disposal of two Ledbury tanks from their existing bund and replaced with two new 30m3 tanks appropriate to store and dispense.

  • Display and pumping system of all tanks within this bund shall be modified to reflect the new tanks and their capacities and similarly reflected in the DAA I-host software system.

  • All existing plumbing and pumps were modified to house in appropriate positions to ensure the integrity of the system, pumps etc. away from external elements and possible standing water &/or PA liquid.

Design

Industry leading knowledge to help aid with the deisgn processes through a highly qualified and industry award winning team

Relationships

  • Supplier relationships of industry products

  • Bringing contractors together to make the project run smoothly

  • Industry relationships through years of experience and commercial success

MCC

  • Factory testing provided by R&R

  • After installation on site and power connected, the MCC will be tested again

Training Plan

DPS will provide sufficient training to personnel to enable them to correctly and safely operate and after installation on site and power connected, the MCC will be tested